On another thread, I posted that I've been putting off refilling the holes in my kitchen walls, where the electrician moved the power point sockets. It's been two weeks now. I see them, all 5 of them (doubles), and every day I tell myself that I'll do it. And then I find something more riveting to do like mess about on here. I know I will get around to doing it at some point, but it's as though I have to take myself by surprise! If I plan it, I don't do it.
What jobs have you been putting off and for how long? Make me feel better!
Gransnet forums
Chat
Join the conversation
Registering is free, easy, and means you can join the discussion, watch threads and lots more.
Register now »Already registered? Log in with:
Gransnet »