Good morning all, from a wet and windy Oxfordshire.
Lots of dusting to do today as the builders dont work weekends and everything seems to be covered in a fine layer of gritty dust, although I’ve used door snakes ( is that what they are called?) across the bottom of the doors to our other rooms, so it shouldn’t be too much to do, then change the bedding,
MrOops has the flu and cough that is going around, so his bed will need doing as well. The plan was that we would both sleep upstairs whilst the bathroom is being done as the loo is up there, but I don’t want to catch whatever he has, so I’m downstairs and have to creep up if I want to use the loo, no late night drinks for me!
I was in bed at 8.30 last night, so once my head wobble sorts itself out I’ll be raring to go.
Bathroom will now take 3 weeks instead of 10 days because every item that they sent was either the wrong size, totally wrong design or wrong colour. As the replacements won’t be here until Monday, the Tiler and Electrician have taken other work on until Thursday as they can’t start on a Monday morning.
To say I was upset was an understatement, so was our fitter he stormed off with the radiator in his van to sort out the supplier.
Thank goodness MzOops isn’t coming home until the 7th Dec. I will just have her room back to normal as she steps off the train. She is in the High Tatras at the moment, very cold and lots of snow.
Bellasnonna💐
Have a good weekend everyone, stay warm and dry if you can.